MOODY CENTER ARENA, UT, AUSTIN, TX Carly Purcell, April 23, 2024April 25, 2024 The Moody Center will be the University of Texas’ new arena for hosting athletic and concert events. CHALLENGE Bosworth Steel reached out to us needing to urgently connect several media platforms throughout the facility and preferred to avoid welding. SOLUTION LNA Solutions proposed using type BK BeamClamp® Assemblies for this project, which Bosworth agreed upon. This was a quick turnaround project and the design and components were needed overnight. LNA was able to provide the parts and drawings within a 24 hour period. Original Case Study FLAT AND SLOPED (TYPE BK) Hot Dip Galvanized BS EN ISO 1461 Manufactured from Ductile Iron to BS EN 1563 5 to 1 Factor of Safety Lloyds Register approved Self adjusting body style EXECUTION BEAMCLAMP® APPLICATION METHODS Fasteners