SAN FRANCISCO BAY AREA Carly Purcell, May 21, 2024May 13, 2024 Rapid Transit BART Monorail Upgrades CHALLENGE: The Bay Area Rapid Transit (BART) System is the main public transportation system connecting San Francisco, Oakland, and the surrounding suburban areas. It comprises over 120 miles of tack utilizing both elevated heavy rail, subway, and light rail systems. It was originally constructed in 1972 and is currently being extended to San Jose with the Silicon Valley BART Extensions. Currently, the BART system is being upgraded with new conduit through the subway tunnels. This conduit will house wiring that powers and supports the automation controls for the entire transit system. SOLUTION: BART and the Engineering Team trusted LNA Solutions to design a Custom BeamClamp Assembly that is capable of supporting new conduit connected to the roof of the tunnel of the new BART M-Line, especially in a seismic design region. LNA Solutions BeamClamp was specified for this project in order to avoid field welding which would have require site power and would have created a hazardous working condition in the tunnels. Each Custom BeamClamp Assembly was installed every 1.5′ along the steel tunnel to provide adequate support to the new conduit. EXECUTION BEAMCLAMP APPLICATION METHODS Fasteners